Services
Supply and install on new construction and renovations, with floor prep, removal, and wall base included. Our three biggest installs are LVT, carpet tile, and ceramic tile. Commercial work only.



Most requested
Offices, clinics, schools, retail
LVT and LVP are our most requested installs. We put in glue-down and click systems that are waterproof, durable, and quick to install, including wood-look plank that holds up to heavy traffic. Every job includes subfloor prep and removal of the old flooring.
Offices, schools, churches, government
Modular carpet tile lets you replace one tile at a time instead of the whole room. We handle single floors, full buildings, and multi-location rollouts, and it is our second most requested install.
Lobbies, restrooms, break rooms, corridors
Floor and wall tile, including large-format porcelain, installed to spec with the prep and leveling it needs for clean, flat grout lines. We read plans, do the takeoff, and handle submittals and samples.
Hospitals, medical offices, labs, kitchens
Seamless, cleanable floors with heat-welded seams and integral flash cove where the spec calls for them. We have done many hospital and medical office jobs. More on healthcare flooring.
Schools, hallways, break rooms, warehouses
Vinyl composition tile laid to the pattern in the spec, with full floor prep and removal of the old tile. A common choice on public and state-funded work, where we are a registered South Carolina vendor.
Offices, churches, conference rooms
Wall-to-wall commercial carpet with glue-down installs, clean seams, and proper stretching. Old carpet removal is included on renovations.
Gyms, stairwells, schools, public buildings
Rubber tile and sheet flooring, rubber stair treads and risers, and stair nosing, installed to code with clean transitions. Slip resistant and built for heavy traffic.
Lobbies, offices, churches, corporate spaces
Engineered and solid wood for commercial spaces, installed over a properly prepped subfloor with matching transitions and base.
Every renovation and new build
Most flooring failures start with bad prep. We remove old carpet, tile, VCT, and sheet vinyl along with the adhesive, then grind, patch, check moisture, and self-level so the new floor lays flat and holds its warranty.
Included on every install
Rubber cove base, transition strips, reducers, and stair nosing, installed straight and tight so the job passes the punch list the first time.
Get a quote
Email your plans and specs, the project address, and your timeline. We will get back to you with a number in two business days or less.